Solutions
Supply Chain
Planning and execution across systems that were never designed to talk to each other.
Overview
Demand signals, supplier commitments, logistics status and the reconciliation between all three.
Where it hurts
- 01
Fragmented visibility
Status assembled by email.
- 02
Exception handling
Every delay handled manually, from scratch.
Case studies

Fruit processing group · Bulgaria · major European processor, seasonal, export-led
Board-Level Power BI Reports on a Fruit Processor's Bespoke ERP
- reporting areas, one shared model
- 4
- reporting areas, one shared model
- pages of ERP documentation available
- 0
- pages of ERP documentation available

US industrial distributor · 50+ locations · valves, pipe and flow-control products
Industrial Distributor Shipping Paperwork, Automated with UiPath
- documents separated out of each scanned batch
- 5-6
- documents separated out of each scanned batch
- signatures verified for each shipment
- 3-4
- signatures verified for each shipment
Offers
3 weeks
Integration Blueprint
Three weeks mapping the systems, the data contracts and the failure modes - before anyone writes integration code.
- Target architecture
- Failure-mode catalogue
6 weeks
Process Mining Diagnostic
Six weeks of event-log evidence answering where the cost actually sits - often upstream of the process you were told to fix.
- The real process
- Cost attribution
